a
afkar_a

Afkar A

@afkar_a

Mechanical Engineer

Indonesia
Inglese, Indonesiano
Alcune informazioni sono riportate in lingua inglese.
Chi sono
I am a detail-oriented Mechanical Engineering graduate with expertise in mechanical design (CAD and FEA), predictive maintenance, and technical troubleshooting. I have practical experience in paper manufacturing and the cement industry, alongside a proven track record in managing mechanical workshops and leading prototype vehicle design projects. I am eager to leverage my analytical and leadership skills to drive operational excellence and innovative engineering solutions.... Continua a leggere

Competenze

a
afkar_a
Afkar A
offline • 

Consulta i miei servizi

Revisione del design e consulenza
I will do something i really good at 3d model design in engineering

Esperienza lavorativa

APP_Group

Maintenance Reliability Engineer Trainee

APP Group • Full time

Mar 2026 - Jun 2026 • 3 mos

Analyzed end-to-end paper making processes and power plant integration. Implemented Basic Safety, Industrial Hygiene, and 5S standards. Applied Total Productive Maintenance (TPM) and Root Cause Analysis (RCA) during field troubleshooting. Collaborated with senior mechanics to dismantle press section rolls and replace centrifugal pump bearings. Presented technical findings to enhance workshop efficiency.

Universitas_Andalas

Mechanical Drawing Crew Assistant Lecturer

Universitas Andalas • Part time

Jul 2022 - Aug 2025 • 3 yrs 1 mo

Instructed mechanical engineering students on reading and creating technical drawings, focusing on 2D, Isometric views, and GD&T standards. Assisted lecturers in providing instructions for drawing assignments and evaluated student results using CAD software.

PT_Semen Padang

Maintenance Engineer

PT Semen Padang • Full time

Aug 2024 - Sep 2024 • 1 mo

Executed maintenance on apron feeder conveyors and coal mill gate valves. Performed preventive maintenance on rotary kilns and vertical coal mills. Conducted technical failure analysis using Finite Element Analysis (FEA) to model spring stress and fatigue life, recommending a 5-year preventive maintenance schedule.