**Reliable Cost Estimator for General contractors & Subcontractors** | Civil Engineer with **15+ years** of experience in **cost estimation, material takeoffs, and BOQ preparation**. I provide accurate, CSI-coded quantity takeoffs and cost estimates for residential, commercial, and industrial projects using **PlanSwift, Bluebeam Revu, and Excel**. My focus is on precision, fast turnaround, and helping contractors submit competitive bids, control project costs, and win more contracts with confidence. ... Continua a leggere

Competenze

e
evansestimates
Evansestimates
offline • 
Tempo di risposta medio: 1 ora

Consulta i miei servizi

Computo dei materiali e stima dei costi
I will do material take off, quantity surveying and cost analysis

Portfolio

Esperienza lavorativa

Existing Building and Renovation Works

McG & FH Company LTD

May 2025 - Present1 yr 2 mos

Challenges and Solutions 1. Incomplete Drawing Details Some structural and service details were not fully clarified. Solution: I carefully cross-referenced architectural and structural drawings and prepared RFIs to obtain confirmation before finalizing quantities. 2. Complex Structural Elements (Steel Beams & Suspended Slab) Accurate measurement of steel universal beams, connection bolts, and suspended slab components required careful coordination. Solution: I performed detailed sectional analysis and verified dimensions against structural schedules to ensure precise takeoffs. 3. Integration of Multiple Systems (Waterproofing, Soundproofing, Underground Heating) Coordinating quantities across different trades increased the risk of overlap or omission. Solution: I separated measurements by trade package and created a systematic takeoff checklist to avoid duplication or missing items. 4. Renovation Constraints Existing conditions created uncertainties in demolition and new wall quantities. Solution: I applied measured assumptions based on drawings and highlighted provisional quantities where necessary to maintain transparency. Through structured analysis, coordination, and attention to detail, the project was completed with accuracy and professional clarity.