
Engr. Fida Dar
Level 2
USA ONLY Permit Plans, PE Stamp, Structural Calcs, Takeoffs, 3D Renders
Competenze

Consulta i miei servizi


Vuoi lavorare su base oraria?
Spiega a Engr. Fida Dar cosa ti serve.
40 USD
/
oraPortfolio
508 Recensioni
| (464) | ||
| (34) | ||
| (4) | ||
| (1) | ||
| (5) |
Valutazione dettagliata
- Livello di comunicazione del venditore
- Qualità della consegna
- Valore della consegna
Ordina per
rameveer
Cliente abituale

Stati Uniti
Muhammad completed the permit plans for 4-seaons sunroom edition in NC. Everything was a very smooth and professional process. He was very meticulous on the details so that the contractor was able to understand all the framing details. Prior to drawing up the plan, he ensure that he understood our...
1 giorno
Tempo

Civile e Strutturale
Risposta del venditore
sunbearconstruc
Cliente abituale

Stati Uniti
This is the second time that I I have worked with Fida to draft structural plans, first for a large deck design and now a second story bump out addition with a covered deck attached, he has exceeded my expectations both times. Fida provides plans that are ready to submit for permit approval, and he...
1 giorno
Tempo

Disegno 2D e Planimetrie
Risposta del venditore
adrianavery606

Norvegia
The service exceeded my expectation by far. I can honestly say that I got more value then you paid for.
9 giorni
Tempo

Civile e Strutturale
Risposta del venditore
kawasakimt
Cliente abituale

Stati Uniti
Ordine annullato
Do NOT hire this freelancer, he requested as many as FOUR extensions, I waited for him from 2/26 to 3/28, then I found out his work in full of useless drawings and kindergarten grade structural calculations. He does NOT know building code, loan calculation, vertical and shearing wall detail and elements;...
4 settimane
Tempo

Disegno 2D e Planimetrie
kawasakimt
Cliente abituale

Stati Uniti
The final delivery did not meet expectations. The structural drawings contained extensive errors and were not complete. Key components such as the foundation plan, beam plan, header plan, and shear wall plan were either incorrect or missing critical details. Load calculations were not properly addressed,...
4 settimane
Tempo

Civile e Strutturale
Risposta del venditore