G. Hussain P.E.
Professional Engineer
Competenze
Consulta i miei servizi


Portfolio
Esperienza lavorativa
Manager Planning, Designing and Execution
Consulting • Full time
Jul 2016 - Present • 10 yrs
Developed a remedial roof design resolving RAAC plank integrity issues with UK-compliant timber joist solutions. Prepared detailed quantity takeoff and cost estimate for structural refurbishment works, supporting the client’s successful tender winning valued at £0.50 million. • Prepared detailed material takeoff and unpriced Bill of Quantities for the Emo Residence in Ireland, covering all trades from substructure to finishes • Performed detailed quantity takeoff and prepared unpriced Bill of Quantities for residential renovation at 5 Darley Court, Palatine Square, Dublin 7 (Ireland). • Prepared complete Bill of Quantities and detailed quantity takeoff for House 18, Invermark Cape Town, with a total project value of R18.6 million, covering all trades. • Performed detailed quantity takeoff for a Residence in California, covering concrete, reinforcement, CMU walls, formwork, and steel works for cost estimation. • Prepared material takeoff, Bills of Quantities, and cost estimates for electrical and plumbing works on multiple commercial projects in Pittsburgh (USA), with project values ranging from USD 0.1–0.5 million. Developed a remedial roof design for a 1970s shopping center in Tamworth (UK), resolving RAAC plank integrity issues with Eurocode-compliant timber joist solutions. • Conducted structural analysis and design for adding a new car parking level atop the existing 2-story Autodepot building in Sint Martin, exploring ductile moment-resisting frame alternatives to RCC wall proposal and developing column and foundation strengthening solutions for seismic zone (0.3g) compliance. • Performed seismic evaluation, structural optimization, and Tekla detailing support for a self-supporting indoor steel structure at St. Louis, MO, USA, designed per ASCE 7-10 and AISC 360-16 (SDC C), optimizing framing and column sizes through ETABS analysis while maintaining safety and performance.