I will do full gc construction cost estimation and quantity takeoff using csi divisions
BIM Engineer
Livello 2
Ha soddisfatto criteri di prestazioni elevate e ha una comprovata esperienza nel soddisfare le aspettative dei clienti.
Informazioni su questo servizio
I provide Full General Contractor (GC) Cost Estimation and Quantity Takeoff based on your construction drawings, specifications, and project documents.
My estimates are organized using CSI MasterFormat divisions and can include applicable architectural, structural, civil, MEP, and other construction scopes.
My Services Include:
Detailed Quantity Takeoff
Material Takeoff
Material Cost Estimation
Labor Cost Estimation
Equipment Cost Estimation
CSI MasterFormat Organization
Division-Wise Cost Breakdown
General Conditions
Overhead & Profit
CSI Divisions
I can organize your estimate according to applicable CSI MasterFormat divisions, including:
01 General Requirements
02 Existing Conditions
03 Concrete
04 Masonry
05 Metals
06 Wood, Plastics & Composites
07 Thermal & Moisture Protection
08 Openings
09 Finishes
10 Specialties
11 Equipment
12 Furnishings
13 Special Construction
14 Conveying Equipment
21 Fire Suppression
22 Plumbing
23 HVAC
25 Integrated Automation
26 Electrical
27 Communications
28 Electronic Safety & Security
31 Earthwork
32 Exterior Improvements
33 Utilities
Only the divisions applicable to your project will be included.
Preferenza per lo stile di consegna
Informa il freelance di eventuali preferenze o preoccupazioni relative all'uso di strumenti di IA nel completamento e/o nella consegna dell'ordine.

