I will draw 2d warehouse layout, factory layout, logistics plan and floor plan


Informazioni su questo servizio
Hello and welcome to my gig:
I will create professional 2D warehouse layouts, factory layouts, logistics layouts, and floor plans for industrial, commercial, and storage facilities. I focus on efficient space planning, workflow optimization, and clear technical drawings.
This service is suitable for:
- Warehouses
- Factories
- Workshops
- Storage facilities
- Logistics and distribution centers
- Office and commercial floor plans
My services include:
- 2D warehouse layout
- Factory layout planning
- Logistics and workflow layout
- Equipment layout
- Storage rack layout
- Industrial floor plans
- Space planning and layout optimization
- AutoCAD 2D drawings
What you will receive:
- Professional 2D layout drawing
- Fully dimensioned floor plan
- Equipment and storage layout
- Clear and organized drawing
- Print-ready PDF or DWG file
Please contact me before placing an order to discuss your project requirements.
I look forward to working with you.
Verifica del servizio e preferenze di stile della consegna
Fiverr non seleziona freelance in questa categoria. Verifica le qualifiche e discuti dei requisiti con il freelance prima di effettuare l'ordine, incluse eventuali preferenze in merito all'uso di strumenti di IA.
Scopri di più su Henry grace
Henry G
- DaRegno Unito
- Membro damar 2026
- Tempo di risposta medio4 ore
Lingue
Inglese, Francese, Tedesco, Spagnolo
Altri servizi della categoria Architettura e Interior design offerti da me
FAQ
Q: What do you need to start the layout?
A: I need building dimensions, sketches, equipment list, storage requirements, or reference layouts.
Q: What file format will I receive?
A: You will receive PDF and/or DWG AutoCAD files.
Q: Can you redesign an existing warehouse layout?
A: Yes, I can redesign and optimize existing layouts for better space usage and workflow.
Q: Do you use AutoCAD?
A: Yes, I create professional 2D layouts using AutoCAD and other drafting tools.
Q: Can you add storage racks and equipment layout?