I will do insulation coordination in pscad

Alcune informazioni sono riportate in lingua inglese.

India

Parlo Inglese

Power System Consultantcy

Power systems engineer with 8 years of experience delivering grid studies, Power System studies and Protection Coordination for renewable energy, oil & gas, and industrial projects across India, USA, ...
Informazioni su questo servizio

Slow-Front Overvoltage (SFO) Study

Line energisation and re-energisation switching surges

Capacitor bank switching transients

Load rejection overvoltage

Statistical overvoltage distribution (2% / mean values)


Temporary Overvoltage (TOV) Study

Single line-to-ground fault overvoltage on healthy phases

Load rejection and Ferranti effect assessment

Resonance and ferroresonance screening

System earthing factor calculation


Fast-Front Overvoltage (FFO) Study

Lightning surge propagation and attenuation

Surge arrester energy absorption verification

Equipment withstand margin against BIL/BSL


Very Fast-Front Overvoltage (VFFO) Study

GIS disconnector switching transients

Transferred surge analysis at GIS-cable/OHL interfaces

Internal and external VFFO assessment


Transformer Energisation & Inrush Study

Inrush current magnitude and duration

Sympathetic inrush in adjacent transformers

Point-on-wave switching strategy assessment

Protection relay coordination input (inrush restraint)


Transient Recovery Voltage (TRV) Study

Circuit breaker TRV rate-of-rise and peak assessment

Comparison against IEC 62271 breaker withstand capability

Fault clearing and out-of-phase switching scenarios

Il mio portfolio

Tag correlati